In another idiotic product from Acer with a damaged numpad and 240Hz PWM for AMOLED, readers should be interested in only one thing - the performance of the 7840U at PL1=18W.
And this is a direct competitor to the i7 1355U, right?
So, the HP x360 with 1355U, a review of which appeared here a little earlier, with PL1=30W, is completely inferior to the 7840U with PL1=18, which consumes as much as 40% less and at the same time is more than 50% faster than the 1355U in sustained multi-threaded performance.
Thus, Meteor Lake will not be able to even come close to Zen3 2 from a year ago, not to mention Zen3+ and especially Zen4 in terms of energy efficiency, i.e. performance at 1W.
Intel is a complete failure with the 13th generation...and will not be able to offer us anything in 2024 with Meteor Lake. Not only that, they previously assured that TB5 would be there, but it won't be there according to their presentation slides, opened on September 19th. Just as, to the shame of Intel, MeteorLake will not have a full-fledged DP2.0+ at 80Gbps for real support for 8k monitors. And what's even more shameful is that according to their own presentation, even their stripped-down DP2.1 will be worse than the old DP1.4b at 32Gbps, because Intel's slides indicate a maximum of 2.1 at 20Gbps (if this is not a stupid mistake by Intel staff).
Intel's complete failure is already guaranteed in 2023. Only one thing saves them - their own factories and a sales ratio relative to AMD of more than 5:1...
Meteor Lake should be renamed Turtle Lake.