News:

Willkommen im Notebookcheck.com Forum! Hier können sie über alle unsere Artikel und allgemein über Notebook relevante Dinge disuktieren. Viel Spass!

Main Menu

Mireo Plus B/H: Battery and hydrogen powered trains tested on Siemens' rail test facility

Started by Redaktion, June 23, 2023, 11:19:48

Previous topic - Next topic

Redaktion

Background: In Wegberg-Wildenrath, Notebookcheck.com was able to take a look at (and take lots of pictures of) the latest electric multiple units (EMUs) with LTO (lithium titanate oxide) batteries and fuel cells, which can run independently of an overhead line (electrical cable). We also show the first large fleet scenario that will take place around Berlin.

https://www.notebookcheck.net/Mireo-Plus-B-H-Battery-and-hydrogen-powered-trains-tested-on-Siemens-rail-test-facility.726579.0.html

Markiz

Surely a multi pronged approach is in reality always necessary, and often gives the benefit of being more resilient.

It's still sad that batteries are NEEDED in trains.

nope

Batteries or fuel cells in trains are dumb, just build the damn catenary line or 3rd rail to supply the power, it will be expensive short term but MUCH CHEAPER in the long run.

A

Quote from: Markiz on June 23, 2023, 16:06:56Surely a multi pronged approach is in reality always necessary, and often gives the benefit of being more resilient.

It's still sad that batteries are NEEDED in trains.

Why is it sad exactly?

Quick Reply

Warning: this topic has not been posted in for at least 120 days.
Unless you're sure you want to reply, please consider starting a new topic.

Name:
Email:
Verification:
Please leave this box empty:

Shortcuts: ALT+S post or ALT+P preview